Kitchen Brand Store
Select Location

Cata MC 25 GTC WH Oven

(0 reviews)
Estimate Shipping Time: 2 Days

Price:
Rs51500 /Pc
Discount Price:
Rs46350 /Pc

Quantity:

Total Price:

Enter PINCODE for shipping cost
Delivery at: Select Location
Product Enquiry
Share:

About Product:

Microwave built-in 25 liters

Quartz 1 simultaneous grill. 000W

Five levels of power, output 900W

Interior in stainless steel

Swivel ¸ 315 mm plate

0 to 95 minute timer

Automatic time and weight defrost

8 automatic access menus

Button quick start

Easy installation

Security lock

White glass finish

Width of 60 cm

Dimensions

Length: Width: Height:
Product:
Package:

Legal Metrology

Part/ Model Number:
Country Of Origin:
Manufacturer:
Importer Contact Information:
Included Components:

Toll Free Number: 011-47527999/1800-11-6272

Installation Process:-

Installation Process for Catac Kitchen Chimney

Thank you for choosing Catac Kitchen Chimney. We are committed to providing you with the best installation service. Please follow the steps below to ensure a smooth and hassle-free installation process.

Step 1: Call Customer Support

Call our customer support number at011-47527999 to schedule an installation appointment. Our representatives will assist you in selecting a suitable date and time for the installation.

Step 2: Gather Necessary Information

Make sure to have the following information ready before calling customer support:

  • Model number of your Catac Kitchen Chimney
  • Size and type of your kitchen chimney (wall-mounted or island)
  • Location of the installation (wall or ceiling)
  • Any additional requirements or concerns

Step 3: Save Service Request Number

Once you have scheduled an installation appointment, our customer support representative will provide you with a service request number. Please save this number for future reference.

Step 4: Prepare for Installation

Prior to the installation, please make sure to:

  • Clear the area where the kitchen chimney will be installed
  • Ensure that there is a power outlet nearby for the chimney to be connected
  • Keep all necessary tools and equipment ready

Step 5: Installation Day

On the scheduled installation day, our technicians will arrive at your doorstep with all the necessary tools and equipment. They will install the kitchen chimney according to the specifications provided by you.

Step 6: Final Inspection and Demonstration

Once the installation is complete, our technicians will conduct a final inspection to ensure that everything is in working order. They will also provide you with a demonstration on how to use and maintain your new Catac Kitchen Chimney.

Step 7: Feedback

We value your feedback. Please take a few minutes to share your experience with us. Your feedback will help us improve our services and serve you better in the future.

Congratulations! Your Catac Kitchen Chimney is now installed and ready to use. Thank you for choosing Catac. We hope you enjoy your new kitchen chimney.

There have been no reviews for this product yet.

Post Query/ Review/ Request (Rs. 50 Reward)

+ =

Product Queries (0)

There are no queries.

Available in Renewed Condition (0)

There are no products.

X
X
X
X
X
X